Excavation work in progress on both sides of RWY 14/32.
2025-03-11 14:39 - 2025-06-12 23:59
Period of Applicability
2025-03-11 14:39 - 2025-06-12 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Excavation is taking place on both sides of RWY 14/32 at a distance of 45 meters and more from the runway centerline. Equipment height is up to 3 meters operational, and equipment will be removed during aircraft takeoff and landing.
Message
RWY 14/32: EXCAVATION WIP ON BOTH RWY SIDES AT DIST 45M AND MORE FROM RCL. EQPT HGT UP TO 3M OPR, DRG ACFT TKOF/LDG EQPT REMOVED.