Earthwork operations on both sides of runway 14/32, with equipment up to 3.5m high operational.
2025-06-11 08:00 - 2025-09-12 21:00
Period of Applicability
2025-06-11 08:00 - 2025-09-12 21:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Earthwork operations are taking place on both sides of runway 14/32, extending 45 meters from the runway centerline. Equipment up to 3.5 meters high is operational and will be removed before aircraft takeoff or landing.
Message
EARTHWORK OPS INPR ON BOTH SIDES OF RWY 14/32, DIST 45M FM RWY CL AND BEYOND. EQPT UP TO 3.5M HIGH OPR AND WILL BE REMOVED BEFORE ACFT TKOF/LDG.