A4210/25
Checking status...
Runway Operations

Earthwork operations on both sides of runway 14/32, with equipment up to 3.5m high operational.

2025-06-11 08:00 - 2025-09-12 21:00

Period of Applicability

2025-06-11 08:00 - 2025-09-12 21:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Earthwork operations are taking place on both sides of runway 14/32, extending 45 meters from the runway centerline. Equipment up to 3.5 meters high is operational and will be removed before aircraft takeoff or landing.

Message

EARTHWORK OPS INPR ON BOTH SIDES OF RWY 14/32, DIST 45M FM RWY CL AND BEYOND. EQPT UP TO 3.5M HIGH OPR AND WILL BE REMOVED BEFORE ACFT TKOF/LDG.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4210/25 NOTAMR A1422/25
Q) URRV/QMAHW/IV/B/A/000/999/4249N04739E005
A) URML B) 2506110800 C) 2509122100
E) EARTHWORK OPS INPR ON BOTH SIDES OF RWY 14/32, DIST 45M FM RWY CL
AND BEYOND. EQPT UP TO 3.5M HIGH OPR AND WILL BE REMOVED BEFORE
ACFT TKOF/LDG.
Issued at: 2025-06-11 08:51
Was this helpful?