GNSS is unreliable at the aerodrome and all GNSS-based RNAV and GLS procedures for runways 05/23 are unavailable due to GBAS failure.
2025-09-18 08:30 - 2025-12-21 23:59
Period of Applicability
2025-09-18 08:30 - 2025-12-21 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
GNSS operation is unreliable within the aerodrome area; RNAV(GNSS) approaches, RNAV SIDs/STARs, and GLS procedures for runways 05/23 are not available due to GBAS channels 20826 and 20415 failure.
Message
GNSS OPERATION UNRELIABLE WI AD AREA. RNAV(GNSS), SID/STAR RNAV(GNSS), GLS 05/23 PROC NOT AVBL DUE TO GBAS CH20826, CH20415 FAILURE.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 19 days ago
Was this helpful?