U0761/25
Checking status...
Unknown Category

New charge rates established at the airport effective March 1, 2025.

2025-06-23 13:00 - PERM

Period of Applicability

2025-06-23 13:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Effective from March 1, 2025, new charge rates have been established at the airport, including a takeoff and landing charge of 16.96 USD per 1 ton maximum takeoff mass (MTOM) and an investment levy of 5.95 USD per 1 ton MTOM.

Message

01 MAR 2025 FLW CHARGE RATES ESTABLISHED IN AIRPORT: 1. TKOF AND LDG CHARGE (INCLUDING INVESTMENT LEVY) - 16.96 USD PER 1 T MTOM, 1.1 INVESTMENT LEVY - 5.95 USD PER 1 T MTOM, 2. CHARGE FOR ENSURING...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

U0761/25 NOTAMN
Q) UUWV/QFAXX/IV/NBO/E/000/999/5558N03725E005
A) UUEE B) 2506231300 C) PERM
E) 01 MAR 2025 FLW CHARGE RATES ESTABLISHED IN AIRPORT:
1. TKOF AND LDG CHARGE (INCLUDING INVESTMENT LEVY) - 16.96 USD
   PER 1 T MTOM,
1.1 INVESTMENT LEVY - 5.95 USD PER 1 T MTOM,
2. CHARGE FOR ENSURING AVIATION SECURITY (INSPECTION AND PASSPORT
   CONTROL NOT PROVIDED) - 1.40 USD PER 1 T MTOM,
3. CHARGE FOR USING THE TERMINAL BUILDING:
   3.1 TERMINAL B - 20.32 USD PER 1 PASSENGER,
   3.2 TERMINAL C - 20.32 USD PER 1 PASSENGER,
   3.3 TERMINAL D - 20.32 USD PER 1 PASSENGER,
   3.4 TERMINAL E - 12.18 USD PER 1 PASSENGER,
   3.5 TERMINAL F - 12.18 USD PER 1 PASSENGER.
4. PARKING CHARGE - 5.0 PCT OF TKOF AND LDG CHARGE (EXCLUDING
   INVESTMENT LEVY) PER 24 HR.
REF AIP RUSSIA GEN 4.1-8.
Issued at: 2025-06-23 13:50
Was this helpful?