U1487/24
Checking status...
Airport Maintenance

New airport charges for take-off and landing operations effective January 1, 2025.

2024-12-04 07:00 - PERM

Period of Applicability

2024-12-04 07:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Charges for take-off and landing operations have been established at 16.96 USD per metric ton of maximum take-off mass (MTOM), which includes an investment component of 5.95 USD per metric ton of MTOM.

Message

JAN 01 2025 FLW AD CHARGES ESTABLISHED: 1. CHARGE FOR TAKE-OFF/LANDING OPERATIONS (INCLUDING INVESTMENT COMPONENT) 16.96 USD PER 1 T MTOM, 1.1 INVESTMENT COMPONENT INCLUDED - 5.95 USD PER 1 T MTOM, 2...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

U1487/24 NOTAMN
Q) UUWV/QFAXX/IV/NBO/E/000/999/5558N03725E005
A) UUEE B) 2412040700 C) PERM
E) JAN 01 2025 FLW AD CHARGES ESTABLISHED:
1. CHARGE FOR TAKE-OFF/LANDING OPERATIONS (INCLUDING INVESTMENT
COMPONENT) 16.96 USD PER 1 T MTOM,
1.1  INVESTMENT COMPONENT INCLUDED - 5.95 USD PER 1 T MTOM,
2. CHARGES FOR ENSURING AVIATION SECURITY
1.39 USD PER 1 T MTOM - INSPECTION AND PASSPORT CONTROL NOT
PROVIDED,
3. CHARGE FOR USING THE TERMINAL BUILDING:
   3.1  TERMINAL B - 19.73 USD PER 1 PASSENGER,
   3.2  TERMINAL C - 19.73 USD PER 1 PASSENGER,
   3.3  TERMINAL D - 19.73 USD PER 1 PASSENGER,
   3.4  TERMINAL E - 11.59 USD PER 1 PASSENGER.
   3.5  TERMINAL F - 11.59 USD PER 1 PASSENGER.
4. CHARGE FOR PARKING (3HR AND MORE AFTER LDG) :
4.1 - BTN 06.00 AND 22.00 - 1.00 PER CENT OF CHARGE FOR
      TAKE-OFF/LANDING OPERATIONS (EXCLUDING INVESTMENT COMPONENT)
      PER 1 HR
4.2 - BTN 22.0 AND 06.00 - 1.50 PER CENT OF CHARGE FOR
      TAKE-OFF/LANDING OPERATIONS (EXCLUDING INVESTMENT COMPONENT)
      PER 1 HR.
REF AIP RUSSIA GEN 4.1-8.
Issued at: 2024-12-04 07:39