Taxiways P8, S8, and a portion of Taxiway P9 are closed for operations, along with the runway crossing at Taxiway P8-S8 and full length takeoff from Runway 29R.
2025-04-29 12:46 - 2025-05-07 11:30
Period of Applicability
2025-04-29 12:46 - 2025-05-07 11:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Multiple taxiways and runway crossing are not available for operations, including full length takeoff from Runway 29R.
Message
TWY P8 AND S8 NOT AVBL FOR OPS. PORTION OF TWY P9 BTN TWY A AND TWY P8 NOT AVBL FOR OPS. RWY CROSSING TWY P8-S8 NOT AVBL FOR OPS. FULL LEN TKOF FM RWY 29R NOT AVBL. TORA FM INT DEP TWY P7 IS 4027M.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-29 12:48
Was this helpful?