A1825/25
Checking status...
Runway Operations

Installation of an arrester barrier on runway 31 with caution advised for dug-up areas.

2025-08-03 16:38 - 2025-11-03 23:59

Period of Applicability

2025-08-03 16:38 - 2025-11-03 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress for the installation of an arrester barrier on runway 31, with caution advised for both runway shoulders that are dug up between distance to go markers 2 and 1. The dug-up area measures 140 meters by 12 meters and is 0.45 meters from the runway edge, 2 meters away. All aircraft should exercise caution due to men and materials in the area, which is marked and lighted.

Message

WIP FOR INSTALLATION OF ARRESTER BARRIER FOR RWY 31. CTN FOR BOTH RWY SHOULDERS DUG UP BTN DTGM (DISTANCE TO GO MARKER) 2 TO DTGM 1 FOR RWY 31. 1) DIMENSION OF DUG UP AREA 140M X 12M X 0.45M DIST FM RWY EDGE 2M. ALL ACFT EXER CTN FOR MEN AND MATERIAL. ALL WORK AREAS MARKED AND LGTD.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) VIDF/QMWHW/IV/NBO/A/000/999/3359N07447E005
A) VISR B) 2508031638 C) 2511032359
E) WIP FOR INSTALLATION OF ARRESTER BARRIER FOR RWY 31. CTN FOR BOTH
RWY SHOULDERS DUG UP BTN DTGM (DISTANCE TO GO MARKER) 2 TO DTGM 1
FOR RWY 31.
1) DIMENSION OF DUG UP AREA 140M X 12M X 0.45M DIST FM RWY EDGE
2M.
ALL ACFT EXER CTN FOR MEN AND MATERIAL. ALL WORK AREAS MARKED AND
LGTD.