A0011/25
Checking status...
Publication Updates

Refer to AIP Macao ENR 1.10 for flight planning details.

2025-01-22 16:00 - 2025-04-22 16:00

Period of Applicability

2025-01-22 16:00 - 2025-04-22 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Refer to the AIP Macao ENR 1.10 for details on flight planning, specifically for departures from Macau International Airport transiting Guangzhou FIR.

Message

REFER TO AIP MACAO ENR 1.10 FLIGHT PLANNING SECTION 4 CONTENTS AND FORM OF FLIGHT PLAN, 4.2.1 DEPARTURE FROM MACAU INTERNATIONAL AIRPORT TRANSITING GUANGZHOU FIR, FOR FLIGHTS TO THE CONNECTING ROUT...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0011/25 NOTAMN
Q) ZGZU/QXXXX/I /NBO/A /000/999/2209N11335E005
A) VMMC B) 2501221600 C) 2504221600 EST
E) REFER TO AIP MACAO ENR 1.10 FLIGHT PLANNING SECTION 4 
CONTENTS AND FORM OF FLIGHT PLAN, 4.2.1 DEPARTURE FROM MACAU 
INTERNATIONAL AIRPORT TRANSITING GUANGZHOU FIR, FOR FLIGHTS TO 
THE CONNECTING ROUTE G471, OPERATORS ARE REQUIRED TO FILE INITIAL 
FLIGHT PLANNED ROUTE IN ITEM 15 OF THE STANDARD ICAO FLIGHT PLAN 
WITH ROUTE 'IDUMA W41 DOPKU G471'. AIRCRAFT SHALL FOLLOW SID SHL 
AND EXPECT RADAR VECTORS FM IDUMA. REF MACAO NOTAMS A0006/25 AND 
A0007/25.
Issued at: 2025-01-17 07:35
Was this helpful?