H1381/25
Checking status...
Taxiway Operations

Taxiway closures and restrictions due to work in progress.

2025-02-23 12:00 - 2025-02-26 19:00

Period of Applicability

2025-02-23 12:00 - 2025-02-26 19:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiway C between Runway 07/25 and Taxiway B8 is closed due to work in progress. Taxiway K east of Taxiway B is closed. Taxiway B between Taxiways G and K is restricted to a maximum wingspan of 36 meters. Refer to Method of Working Plan 23/002. Timing: Daily from 1200 to 1900, February 25th to February 26th, 2025.

Message

TWY C BTN RWY 07/25 AND TWY B8 CLOSED DUE WIP TWY K EAST OF TWY B CLOSED TWY B BTN TWY G AND TWY K MAX 36M WINGSPAN REFER TO METHOD OF WORKING PLAN 23/002

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

H1381/25 NOTAMN
Q) YMMM/QMXLC/IV/BO/A/000/999/3357S15111E005
A) YSSY
B) 2502231200 C) 2502261900
D) DAILY 1200-1900
E) TWY C BTN RWY 07/25 AND TWY B8 CLOSED DUE WIP
TWY K EAST OF TWY B CLOSED
TWY B BTN TWY G AND TWY K MAX 36M WINGSPAN
REFER TO METHOD OF WORKING PLAN 23/002
Issued at: 2025-02-20 04:51