F1556/26
Checking status...
OBSCrane Operations

Five temporary cranes are erected near the airport and affect the RWY 35R VOR/DME final approach.

2026-04-29 06:55 - 2026-06-10 15:59
Duration:2 months

Period of Applicability

2026-04-29 06:55 - 2026-06-10 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Five new temporary cranes are erected within a 15 km radius of the airport reference point, all marked with red lights. The affected area includes the RWY 35R VOR/DME final approach.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

F1556/26 NOTAMR F8408/25
Q)ZSHA/QOBCE/IV/M/A/000/999/3109N12148E005
A)ZSPD B)2604290655 C)2606101559
E) ADD NEW TEMPO OBST WITHIN A CIRCLE WITH A RADIUS OF
15KM(CENTERED ON THE APR):
OBST ID/DESIGNATION  TYPE  POSITION MAG BRG(DEGREE)/DIST(M)
ELEVATION(M)     MARKING/LIGHTING TYPE AND COLOUR  FLIGHT
PROCEDURE/TAKE-OFF PATH AREA AFFECTED&REMARKS
CRANE 1    CRANE    139/3,206   76.0   RED LGT
CRANE 2    CRANE    146/4,150   76.0   RED LGT
CRANE 3    CRANE    153/3,981   76.0   RED LGT
CRANE 4    CRANE    148/2,983   76.0   RED LGT
CRANE 5    CRANE    145/3,236   85.5   RED LGT    RWY35R VOR/DME
FINAL APPROACH
Was this helpful?