Period of Applicability
2026-06-10 16:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Refer to AIP ZSPD 3P-3(2026-5-1). RWY 16L/16R SID runway transition procedure designation is PIKAS-3 by ATC and PIKAS-5. RWY 17L/17R SID runway transition procedure designation is PIKAS-3 by ATC. Others remain.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?