F1597/26
Checking status...
ADTaxiway Operations

Taxiway E and taxiway R1 are closed at specified sections and intersections.

2026-05-07 17:30 - 2026-07-08 15:59
Duration:3 months

Period of Applicability

2026-05-07 17:30 - 2026-07-08 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway E is closed between taxiway T2 and taxiway R1, with the intersection between taxiway R1 and taxiway E closed. Taxiway R1 is closed between taxiway E and runway 16R/34L, with the intersection between taxiway E and taxiway R1 closed.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

F1597/26 NOTAMN
Q)ZSHA/QMXLC/IV/M/A/000/999/3109N12148E005
A)ZSPD B)2605071730 C)2607081559
E) FLW TWY CLSD:
1. TWY E BTN TWY T2 AND TWY R1 , INTERSECTION CLSD BTN TWY R1 AND
TWY E .
2. TWY R1 BTN TWY E AND RWY16R/34L , INTERSECTION CLSD BTN TWY E
AND TWY R1 .
Was this helpful?