U2048/26
Checking status...
ADTaxiway Operations

Taxiway A and several connecting taxiways are closed.

2026-05-15 18:00 - 2026-05-21 22:00
Duration:VERY SHORTaggregated 8 hours

Period of Applicability

2026-05-15 18:00 - 2026-05-21 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway A is closed. Taxiways A1, A2, B1, B3, B6, B7, B8, B9, B10 and A8 are closed between Taxiway A and Taxiway B, and taxiways A7, A9, B2, B4 and B5 are closed from 1800 to 2200 on May 15 and 21.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

U2048/26 NOTAMN
Q)ZPKM/QMXLC/IV/M/A/000/999/3035N10357E005
A)ZUUU B)2605151800 C)2605212200
D)1800-2200 ON MAY 15 AND 21
E) FLW TWY CLSD
1.TWY A .
2.TWY A1,A2,B1,B3,B6,B7,B8,B9,B10,A8 CLSD BTN TWY A AND TWY B.
3.TWY A7,A9,B2,B4,B5 .
Was this helpful?